Construction Update - 9/22

Construction is continuing as the summer draws to a close.

Structural Steel and Joists continue to be set, detailed and welded into place. The crane has moved from the center courtyard at the addition to the main entry circle, to better reach and erect the canopy steel and joists at what will be the future main entry for the Delhi Rehabilitation & Nursing Center. Along the 2nd level exterior walls the ZIP system is being fastened into place as well.